Pilot Projects

To test the quality criteria and assurance procedures, the QualitEE project has engaged with 28 pilot projects in 11 European countries that span a diverse range of energy efficiency services. The projects represent 33 million Euros of investment, 33 GWh of annual primary savings and over 9,200 tons of annual CO2 emissions savings.

The following page outlines these projects and offers downloads of application reports that cover key project facts, technical aspects and feedback to the application of quality criteria.

  • Austria - Triumph International, Wr. Neustadt

    Austria - Triumph International, Wr. Neustadt

    Overview: EPC contract including changes to the building heating boiler, lighting system and optimisation of the building controls for a 36 876 m2 logistic and storage center in Wr. Neustadt, Austria. The expected investment value is 2 345 660 EUR.

    Annual carbon savings: 618 tCO2 emissions per year

    Annual energy savings: 1 095 470 kWh/year (17,6% energy savings)

    Annual primary energy savings: 1 729 747 kWh/year

  • Austria - Residential Building Hörsching

    Austria - Residential Building Hörsching

    Overview: Change of energy source and optimisation of building controls for a 4 725 m2 apartment building with 54 flats in Hörsching. Contract duration and service provided planned for 20 years. The expected investment value is 74 000 EUR.

    Annual carbon savings: 53.9 tCO2 emissions per year

    Annual energy savings: 123 000 kWh/year (28% energy savings)

    Annual primary energy savings: 151 290 kWh/year

  • Belgium – Municipal Buildings in City of St.Niklaas

    Belgium – Municipal Buildings in City of St.Niklaas

    Overview: Energy efficiency measures in 9 municipal buildings with a floor area of 53 000 m2 and a total energy consumption of 530 000 EUR a year.  This includes schools, sport halls, administrative buildings and a museum.

    The project does not only aim to achieve an ambitious energy savings target (*) – in line with the climate ambitions of the city – but also includes the full maintenance of the buildings, including the major part of the technical installation as well as the building envelope (roof and windows). The contract duration is limited to 10 years but thanks to the application of the innovative ‘residual value’ concept in the contract, the ESCO is motivated to propose investments based on a long term strategy (20 to 30 years).

    (*) The expected energy savings and investment cannot be disclosed in public as procurement of the project is ongoing.

  • Belgium – University Campus VUB, Brussels

    Belgium – University Campus VUB, Brussels

    Overview: The VUB (‘Free University of Brussels-VUB’) launched an ESC-project (Energy supply contract) for its university campus in Brussels. The district heating system consists of 5 boilers with a thermal capacity of 20 MW and a distribution network of 3.4 km. The system provides heat for 15 buildings. The ESC-project is part of an investment programme aiming for climate neutrality of the university in 2050.

    (*) The expected energy savings and investment cannot be disclosed in public as the procurement is being prepared

  • Bulgaria - EPC in a kindergarten in Katunitsa, Sadovo Municipality

    Bulgaria - EPC in a kindergarten in Katunitsa, Sadovo Municipality

    Overview: Energy retrofit of а 2561 m2 kindergarten in Katunitsa, which includes insulation of the external walls and roof and replacement of windows. It is a 7 year EPC contract and the investment value is ~ 204 000 EUR. This is implemented with the support of the Energy Efficiency and Renewable Energy Fund (Bulgaria).

    Annual carbon savings:  72 tCO2 emissions per year (estimated)

    Annual energy savings: 250 000 kWh/year (43% energy savings)

    Annual primary energy savings: 360 000 kWh/year (estimated)

  • Bulgaria - EPC in a school in Kostinbrod, Kostinbrod Municipality

    Bulgaria - EPC in a school in Kostinbrod, Kostinbrod Municipality

    Overview:  Energy retrofit of a school through a 5-year Energy Performance Contract. Measures include thermal insulation of external walls and the roof, replacement of windows and doors, alongside reconstruction of the heating system. The investment value is 118 862 EUR.

    Annual carbon savings: 34 tCO2 emissions per year

    Annual energy savings:126 000kWh/year (64% energy savings)

    Annual primary energy savings: 154 000kWh/year

  • Bulgaria - Efficient refrigeration a Distributional Centre Ruvela, Sofia

    Bulgaria - Efficient refrigeration a Distributional Centre Ruvela, Sofia

    Overview: Installation of 3 efficient refrigeration units in a 350 m2 food distribution centre. The investment value is 53 300 EUR.

    Annual carbon savings: 69 tCO2 emissions per year

    Annual energy savings: 85 000 kWh/year (15% energy savings)

    Annual primary energy savings: 212 000 kWh/year

  • Czech Republic - Academy of Fine Arts

    Czech Republic - Academy of Fine Arts

    Overview: Renovation of heating, lighting, pumps and HVAC systems for the Academy of Fine Arts. This also includes monitoring and energy management. The investment value is 1 700 000 EUR.

    Annual carbon savings: 609 tCO2 emissions per year

    Annual energy savings: 3 155 216 kWh/a

    Annual primary energy savings: 1 713 273 kWh/year

  • Czech Republic - Czech Tehnical University (CVUT)

    Czech Republic - Czech Tehnical University (CVUT)

    Overview: Renovation of heating, lighting, pumps and HVAC systems for the university. This includes monitoring and energy management. The investment value is 850 000 EUR.

    Annual carbon savings: 4223 tCO2 emissions per year

    Annual energy savings: 40 440 714 kWh/a

    Annual primary energy savings: 14 178 847 kWh/year

  • Germany - Office Building in Wiesbaden

    Germany - Office Building in Wiesbaden

    Overview: Lighting renovation of a 400 m2 office building with 20 offices in Wiesbaden. The EPC duration is 4 years and the investment value is 21 500 EUR.

    Annual carbon savings: 4.2 tCO2 emissions per year

    Annual energy savings:10 000 kWh/year (71% energy savings)

    Annual primary energy savings: 18 000 kWh/year

  • Germany - Office Building and Warehouse in Mainz-Kastel

    Germany - Office Building and Warehouse in Mainz-Kastel

    Overview: Lighting renovation of a 2000 m2 office building and warehouse in Mainz-Kastel. The EPC duration is 4 years and the investment value is 31 500 EUR.

    Annual carbon savings: 8.17 tCO2 emissions per year

    Annual energy savings: 19 400 kWh/year (54% energy savings)

    Annual primary energy savings: 34 920 kWh/year

  • Germany - Factory Building (metal working) in Bochum

    Germany - Factory Building (metal working) in Bochum

    Overview: Lighting renovation of a 3500 m2 factory building in Bochum. The EPC duration is 4 years and the investment value is 109 385 EUR.

    Annual carbon savings: 113.87 tCO2 emissions per year

    Annual energy savings: 270 472 kWh/year (67% energy savings)

    Annual primary energy savings: 486 850 kWh/year

  • Germany - Factory Building (metal working) in Bochum

    Germany - Factory Building (metal working) in Bochum

    Overview: Lighting renovation of a 6200 m2 factory building in Bochum. The EPC duration is 4 years and the investment value is 316 990 EUR.

    Annual carbon savings: 317.52 tCO2 emissions per year

    Annual energy savings: 754 202 kWh/year (58% energy savings)

    Annual primary energy savings: 1 357 564 kWh/year

  • Germany - Furniture Industry in Bochum

    Germany - Furniture Industry in Bochum

    Overview: Lighting renovation of a 550 m2 administration building in Bochum. EPC contract duration is 5 years and the investment value is 46 300 EUR.

    Annual carbon savings: 33.92 tCO2 emissions per year

    Annual energy savings: 80 572 kWh/year (75% energy savings)

    Annual primary energy savings: 145 030 kWh/year

  • Greece - Parabita

    Greece - Parabita

    Overview: Re-design of the indoor lighting  for a 103 m2 retail clothing shop in Athens. The investment value is 4000 EUR.

    Annual carbon savings: 4.02 tCO2 emissions per year

    Annual energy savings: 4 061 5 kWh/year (47% energy savings)

    Annual primary energy savings: 11 780 kWh/year

  • Greece - Natural Gas Energy Company

    Greece - Natural Gas Energy Company

    Overview: Energy upgrade of the heating and cooling system for a 1792 m2 office floor in Athens. This includes thermal zoning and new central control system. The investment value is 4000 EUR.

    Annual carbon savings: 14.25 tCO2 emissions per year

    Annual energy savings: 21 350 kWh/year (13% energy savings)

    Annual primary energy savings: 44 800 kWh/year

  • Greece - Central Offices of the ETHER Applications Ltd Company

    Greece - Central Offices of the ETHER Applications Ltd Company

    Overview: Energy upgrade of the indoor lighting system for a 171 m2 office floor area of Paiania in Attiki. The investment value is 3700 EUR.

    Annual carbon savings: 7.7 tCO2 emissions per year

    Annual energy savings: 7 781 kWh/year (57% energy savings)

    Annual primary energy savings: 22 565 kWh/year

  • Latvia – PV for Gulbene Municipality Office Building

    Latvia – PV for Gulbene Municipality Office Building

    Overview: Construction of PV solar system on a 2249.7 m2 municipal administration building with a roof size of 920 m2 .

    Annual carbon savings: 5.41 tCO2 emissions per year

    Annual energy savings: 49 600 kWh/year (35% energy savings)

    Renewable generation: 49 600 kWh/year (electricity)

    Annual primary energy savings: 328 900 kWh/year

  • Slovakia - Building of student dormitory  ŠD5 - Starohájska 2900/8 in Bratislava

    Slovakia - Building of student dormitory ŠD5 - Starohájska 2900/8 in Bratislava

    Overview: Thermal insulation of the building envelope, reconstruction of the heating system, new doors and windows, modernisation of lightning system and water saving measures. Expected EPC duration is 16.5 years and the investment value is 505 000 EUR.

    Annual carbon savings: 86 tCO2 emissions per year

    Annual energy savings: 425 160  kWh/year

    Annual primary energy savings: 578 217 kWh/year

  • Slovakia - Psychiatric Hospital of P.Pinel

    Slovakia - Psychiatric Hospital of P.Pinel

    Overview: Energy efficiency measures are going to be implemented in 13 heated buildings of the hospital complex with a floor area of 12 254 m2. The total energy consumption of the complex is 7.91 GWh per year. The measures required in a procurement stage are a switch from steam to hot water boilers, new heat distribution system, hydraulic balancing, centralised regulation, water saving measures and energy management system implementation. Expected duration of EPC contract is 11 years.

    (*) The expected energy savings and investment cannot be disclosed in public as procurement of the project is ongoing.

  • Slovakia - Service Centre in Nováky town

    Slovakia - Service Centre in Nováky town

    Overview: Deep retrofit of a municipal building in Nováky with a floor area of 829,2 m2. The renovation includes: renewal of heating system, thermal insulation of building envelope, new windows, installation of ventilation system, regulation and energy monitoring and installation of PV plant (10 kW). EPC contract duration is 15 years. The investment value is 560 615 EUR.

    Annual carbon savings: 24.49 tCO2 emissions per year

    Renewable generation: 11 300 kWh per year

    Annual energy savings: 88 510 kWh/year (78% energy savings)

    Annual primary energy savings: 118 250 kWh/year

  • Slovenia - Centre for School and Outdoor Education (CŠOD), Bohinj

    Slovenia - Centre for School and Outdoor Education (CŠOD), Bohinj

    Overview: Deep energy retrofit of a residential building with 1772 m2 of heated area (residential part with 86 beds). Building located in Bohinj, Slovenia.  Contract duration and service provided for 15 years. The investment value is ~720 000 EUR.

    Annual carbon savings: 36.8 tCO2 emissions per year

    Annual energy savings: 216 000 kWh/year (52% energy savings)

    Annual primary energy savings: 209 000 kWh/year

  • Slovenia - Dormitory Building, Maribor, SI

    Slovenia - Dormitory Building, Maribor, SI

    Overview: Deep energy retrofit of a 6675 m2 dormitory with 451 beds in 169 rooms and auxiliary facilities. Building located in Maribor, Slovenia. The investment value is ~1.61 mill. EUR.

    Annual carbon savings: 148 tCO2 emissions per year

    Annual energy savings: 459 000 kWh/year (thermal) 87 000 kWh/year (electrical)  (52% energy savings)

    Annual primary energy savings: 760 000 kWh/year

  • Spain - Multimedia Company

    Spain - Multimedia Company

    Overview: This project involves the construction, commissioning and legalisation of a 96.9 kWh photovoltaic solar installation. The investment value is ~53 000 EUR (estimated).

    Annual carbon savings: 49.2 tCO2 emissions per year

    Renewable generation: 140 531 000 kWh

  • Spain - Supermarket Chain

    Spain - Supermarket Chain

    Overview: Telemetric measurement of electrical supplies by replacing electrical tariff meters that allow the customer to access and display their consumption through the Swap&Play platform. The investment value is ~162 000 EUR.

    Annual energy savings: 324 000 000 kWh/year

  • UK - South Cambridgeshire Hall

    UK - South Cambridgeshire Hall

    Overview: PV car ports, EV charging, ground source heat pump & various efficiency measures for municipal offices in Cambridgeshire. The ambition of this project is to go as far as possible to reducing the Council’s flagship building’s carbon footprint to zero within reasonable economic limits. The investment value is ~1.76 mill. EUR

    Annual carbon savings: 171 tCO2 emissions per year

    Annual energy savings: 827 331 kWh/year (57% energy savings)

    Renewable generation: 498 600 kWh (Heat), 111 204 kWh (Electricity)

    Annual primary energy savings: 1 126 292 kWh/year

  • UK - Dundee City Council

    UK - Dundee City Council

    Overview: Efficiency measures, CHP and PV for eight public buildings (leisure centres (sports facilities), ice rink, community centre, art gallery, library, depot and car park) owned by Dundee City Council. The investment value is ~2 mill. EUR

    Annual carbon savings: 885.94 tCO2 emissions per year

    Annual energy savings: 2 211 635 kWh/year (12% energy savings)

    Renewable generation: 121 962 kWh (Normalised PV Electricity)

    Annual primary energy savings: 4 730 409 kWh/year